Mostly Knitting

My New Book!

Explore

Home
About Me
Blog
Books & Reviews
Butterfly Looms
Contact
Crochet

Edwardian Spiritualism Scrapbook
Embroidery and Sewing
FAQs

Hairpin Lace FAQs
Knitting



Links
Misc Crafts
Photo Galleries
Podsafe Music
Privacy Statement

Recipes

Search
Singercraft Tool
Small Looms

Spinning

Tatting
Teneriffe Lace
Updates
Web Rings & Awards
Writing

Shop Here

Cafepress
Knitting Patterns
Wishlist

Support These

Weather

September 6, 2007

Back to Work

I've picked up Miss Brittany's skull jumper again.

I finished knitting the back and sewed it to the front along the side seams. Then I unzipped the provisional cast on to knit the ribbing.

Skull Jumper in Progress

I have just over a round to knit before I cast off the ribbing, then I can start the sleeves the same way.

I'm working the ribbing for all pieces top down and in the round so that if Brit grows a lot before it's cold enough to wear it again I can just undo the cast off edge and knit more ribbing down.

At this rate it will be finished just in time for Summer!

Entry posted by Sarah at September 6, 2007 12:49 PM | TrackBack

Comments

Post a comment

Verification (needed to reduce spam):

Powered by
Movable Type 3.33

 

 

© Sarah Bradberry. All rights reserved.
ABN: 73 548 786 649